The “Perfect” Request for Information (RFI)

Here are some tips that site selectors should consider for the utility section within their RFIs:

TIP #2

For the utility representative, a “perfect” RFI from a consultant or customer would include this information:

  • Monthly kilowatt-hours and peak kilowatt
  • Delivery voltage required
  • Type of industry
  • Hours of operation
  • Flexibility in operation, if any
  • Special reliability needs
  • Contact for more technical questions